Category: Utility

Utility areas including the cold room

More Floor and Lintels

1 June 202311 February 2024 gjj

Yesterday we had a visit from the windows supplier to agree the height of the lintels above the new door in the utility room and for the existing windows. Florent can now get on with ....

Continue reading
Kitchen, Lounge, Utility

Replacing the Duff Cable

31 May 202311 February 2024 gjj

After installing all the main cables underground, I received a call from the supplier to say that the manufacturer had condemned one of the cables as they had uncovered a manufacturing fault. Great! They shipped ....

Continue reading
External, Garden, Utility

Electrics and External Progress

26 May 202311 February 2024 gjj

The temporary barrier between our garden and Henri's has been taken down in preparation for laying the foundations of the wall that has to be built there. So for a while the dogs cannot be ....

Continue reading
BBQ/Workshop, Car Park, Entrance Gates and Arch, External, Garden, Kitchen, Lounge, Utility

Tie bar and Internal Services

25 May 202311 February 2024 gjj

The tie bar arrived late last night and when I arrived this morning it had already been positioned. I helped with the tensioning but essentially it is done and the remaining wall can be taken ....

Continue reading
Car Park, External, Kitchen, Utility

Electrics and Utility Door

24 May 202311 February 2024 gjj

Hmm. Still trying to figure out how to connect the temporary supply as there were no instructions with the pre-wired unit. I need my multi-meter to work it all out. Esteban has finished shuttering the ....

Continue reading
External, Utility

Utility Door Opening

24 May 202311 February 2024 gjj

The pile of chalk is for blinding the levelled ground but Florent is off site today. Esteban started knocking through the new doorway in the utility room where the old chimney used to be. Meanwhile ....

Continue reading
Car Park, External, Lounge, Utility

BBQ and Services

22 May 202311 February 2024 gjj

When I arrived this morning after leaving early on Friday I was pleased to find the BBQ and Workshop area had been prepared and compacted along with the cleanse and preparation of the bike store. ....

Continue reading
BBQ/Workshop, Bike Store, Entrance Gates and Arch, External, Garden, Kitchen, Lounge, Utility

Internal Breakout

19 May 202311 February 2024 gjj

With the pathway down to the house, The contractors concentrated on breaking out and levelling the internal floor and removing the internal wall. They did not take it all down as there was concern about ....

Continue reading
Kitchen, Lounge, Utility

Floor Removal and Tidying Up

14 May 202311 February 2024 gjj

Tea time over I took these high level shots to show the trenches all filled. Philippe and I then turned our attention to removing the rest of the first floor (or at least the bits ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden, Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

More Water

21 April 202311 February 2024 gjj

Finally managed to apply the chain saw to the tree. Just the stump to remove now. Organised the temporary connections for the water mains but without the counter I am stuck as I cannot turn ....

Continue reading
External, Kitchen, Utility

Posts navigation

Older posts
Newer posts

Recent Posts

  • May 19
  • May 16
  • May 15
  • May 14
  • May 10

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.