PV Panels 2
As part of clearing the car parking I have had to move all the PV panels, not just those for the BBQ area. Discovered a second one damaged unfortunately so that will also need replacing. ....
As part of clearing the car parking I have had to move all the PV panels, not just those for the BBQ area. Discovered a second one damaged unfortunately so that will also need replacing. ....
Having readily I can both form the boxes and the company websites I was finally ready to begin installing the PV panels. The first job was to unpack one to check measurements and I was ....
While Esteban made progress along the rear wall I cleared the car parking area in preparation for the foundations for the second pergola. It meant relocating the site caravan which is now happily sat in ....
Weekend over so up on the roof installing the bolts to secure the roof panels. I was not happy with the spacing so took it all apart and adjusted it to get a more balanced ....
With the sarking wood finished I started to install the covering. First the paper that I stapled to the roof temporarily before then laying out the battens. Drawings and instructions would have been useful. I ....
At the moment there is just me and Esteban on site as everyone else is on holiday. Progress has slowed but not stopped. The tiles have been set on the two stores and the bike ....
The rear wall is bing cleaned and the joints prepared for filling while I get on with removing more of the ivy in the BBQ. All finished (except for the bits that keep growing back ....
More progress on the small stores which are almost ready for roofing. They have also moved onto the rear wall which is exciting. The window detail shows we are planning to leave the raw concrete ....
After our trip to Sancerre I returned to find that the entire end wall had been jointed and the two stores virtually finished. Looking good. The slightly darker mortar helps the stones to stand out ....
I turned up late in the morning to find the new beam had been installed and levelled and most of the external concreting had been done. The rear patio. The workshop and BBQ area that ....