December 6
Workshop shelves again. With the corner done I fitted the second set of shelves. Rest of the time I have been doing writing which is not very photogenic.
Workshop shelves again. With the corner done I fitted the second set of shelves. Rest of the time I have been doing writing which is not very photogenic.
Workshop. Having done the corner the other day I felt duty bound to get the final corner done and the Desmond set of shelves up for Jude. Trimmed in very nicely.
After a lo0t of hassling, the fitter finally arrived to turn on the heating system that was installed months previously as it is getting cold to work here. Two teams installed additional pipework and commissioned ....
Time to start the internal wall structures and tidy the workshop now that it is electrified only to find another visitor in the rear store that has got stuck in a bucket. I took it ....
It's Sunday and I am back again as the tilers insist on working the weekend and I want to oversee what they are doing. Front patio BBQ/Workshop (almost finished) Front bike store. Preparing the rear ....
Friday was a complex day. I started by driving via Cognac to collect Metawaley and bring him here to start working. Then off to Saintes for another length of cable to connect the PV controller ....
In my continuing quest to clear the site as much as possibleI have loaded the trailer for the recycling centre. I have been installing and testing the internet system to enable me to get the ....
Good start to the day (Not). Despite agreeing to a meeting on site this morning I got an SMS from the boss to go to Cognac and collect Metawaley (now on his own) from the ....
I had cancelled the tilers because of the weather. It was partly because I did not want them laying the slabs in wet weather and partly because the weather had pushed my schedule back and ....