Category: BBQ/Workshop
External Slabs 7
It's Sunday and I am back again as the tilers insist on working the weekend and I want to oversee what they are doing. Front patio BBQ/Workshop (almost finished) Front bike store. Preparing the rear ....
External Slabs 5
Friday was a complex day. I started by driving via Cognac to collect Metawaley and bring him here to start working. Then off to Saintes for another length of cable to connect the PV controller ....
External Slabs 4
In my continuing quest to clear the site as much as possibleI have loaded the trailer for the recycling centre. I have been installing and testing the internet system to enable me to get the ....
External Slabs 2
Good start to the day (Not). Despite agreeing to a meeting on site this morning I got an SMS from the boss to go to Cognac and collect Metawaley (now on his own) from the ....
PV Panels 11
I had cancelled the tilers because of the weather. It was partly because I did not want them laying the slabs in wet weather and partly because the weather had pushed my schedule back and ....
Clearing and Bits And Bobs
Emptied more shelving in the bike store and dismantled and rebuilt it in the workshop. The bike store is now clear and ready for floor slabs. Then did the same in the garden store but ....
PV Panels 10
Came in via the electrical shop having bought the bits need to get the cabling from the panels down to the underground cable that connects the BBQ/Workshop to the car park. Having read the manual, ....
PV Panels 9
I am not keen on moving the PV Panels yet again and despite chasing MG Habitat for a return to site date I have heard nothing back. So I have decided to install them on ....
Workshop Interior 2
Lots of site clearing in preparation for the tilers to return for the external slabs. Found time to finish the insulation of the corner of the workshop and clad it in OSB. emptied, dismantled and ....