April 16
The final preparation required the floors to be swept, hoovered and washed to lift the dust. Only then was I able to safely tape a protective cover over the travertine (which is highly absorbent and ....
Utility areas including the cold room
The final preparation required the floors to be swept, hoovered and washed to lift the dust. Only then was I able to safely tape a protective cover over the travertine (which is highly absorbent and ....
Not much to show for a day’s work but these will be the ventilation pipes for the shower and utility rooms. A bit tricky getting the long pipe in through the bogging and with the ....
With the cold store done (except for the ceiling) I turn my attention to the shower room. The sewage pipes are dismantled and glued back In place before getting hidden. Also found time to finally ....