April 24
Lee and Jacque were so efficient that I asked them to do the decorating as well. Lee manipulated the sander on the ceiling and walls and jaqu got on with cutting in the edges before ....
Utility areas including the cold room
Lee and Jacque were so efficient that I asked them to do the decorating as well. Lee manipulated the sander on the ceiling and walls and jaqu got on with cutting in the edges before ....
Lee and Jacque arrive to start the plasterboard jointing. They assure us we will not see the joints after they have finished. They are incredibly quick and accurate with their work and the first coat ....
The final preparation required the floors to be swept, hoovered and washed to lift the dust. Only then was I able to safely tape a protective cover over the travertine (which is highly absorbent and ....
Not much to show for a day’s work but these will be the ventilation pipes for the shower and utility rooms. A bit tricky getting the long pipe in through the bogging and with the ....