Skip to content
  • 15:41
  • Thursday
  • 22 May 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
  • M-B Importation
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
May 19  |  
May 16  |  
May 15  |  
May 14  |  
May 10  |  

Category: Entrance Gates and Arch

More Minor Changes and First Floor Flooring 6

7 May 202423 June 2024 gjj

The finished repair of the front arch. Some changes to the kerbstones. The heat pump position had to be changed (the base was extended some time ago for it) so the pathway became too narrow ....

Continue reading
Entrance Gates and Arch, External, First Floor, Garden, Garden Store, Services, Waste System

Workshop Window and First Floor Flooring 5

6 May 202423 June 2024 gjj

Today Florent and his team are back on site for a couple of days to sort out some minor snagging issues. So I have got them to help me fit the large fixed window in ....

Continue reading
BBQ/Workshop, Bike Store, Entrance Gates and Arch, First Floor, Windows

Electric Gates 2

16 January 202411 February 2024 gjj

By lunchtime, Erik had finished the installation. By then I had installed the lock plate for the new Yale lock and provided a temporary electrical supply for him to test the doors. So finally, we ....

Continue reading
Entrance Gates and Arch

Electric Gates 1

15 January 202411 February 2024 gjj

Back or no back, the gates needed to be installed. Actually the medication has made me much more mobile but I am still cautious about doing anything that exerts too much strain on it. Eric ....

Continue reading
Entrance Gates and Arch

Entrance Arch Damage

28 September 202311 February 2024 gjj

As I left the site this evening I noticed that the crack in the arch has grown even wider. It was quite small when we bought the property but then enlarged following the earthquake. It ....

Continue reading
Entrance Gates and Arch

Painful Errors

20 June 202311 February 2024 gjj

Because I am taking a relaxed approach and only visiting on occasion and not daily, errors begin to occur. When I arrived today I was upset to see what looks to be cement used as ....

Continue reading
Entrance Gates and Arch, External, Kitchen, Utility

Concrete Floor Goes In

13 June 202311 February 2024 gjj

When I arrived on site it was about an hour before the concrete was due to arrive and I found four builders busy on the separation wall which, in a morning, they had just about ....

Continue reading
Entrance Gates and Arch, External, Kitchen, Lounge, Utility

Ivy Finished! (For Now)

12 June 202311 February 2024 gjj

Having sorted the water mains and connections it was back onto sorting out the Ivy and finally the entrance arch is cleared on the roadside. I also did the front wall at the same time. ....

Continue reading
Entrance Gates and Arch

More Ivy Removal

10 June 202311 February 2024 gjj

Quiet day on my own on site today. Finally finished off the ivy on the walls behind the car parking area and down the wall on the roadside between the parking area and the arch. ....

Continue reading
Car Park, Entrance Gates and Arch, External

Garden Wall 1

6 June 202311 February 2024 gjj

Our focus switched to the swimming pool over the weekend to agree where the heat pumps and technical areas will go. Yet more underground cables to be laid! The heat pumps will also affect the ....

Continue reading
Entrance Gates and Arch, External, Garden

Posts navigation

Older posts

Recent Posts

  • May 19
  • May 16
  • May 15
  • May 14
  • May 10

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.