Underfloor Heating 3
While my two assistants watched on, I rearranged the main staircase components, moving them from the first floor to the upper mezzanine. I also sorted the various lengths of parquet ready for the next few ....
Mezzanine leading to the office area
While my two assistants watched on, I rearranged the main staircase components, moving them from the first floor to the upper mezzanine. I also sorted the various lengths of parquet ready for the next few ....
This morning I finished off the final sections of the floor and trimmed it back to the beam before nailing it down. Looks good from above and below but despite my careful sorting it appears ....
While I progressed the flooring on the mezzanine, Socover returned to site to do some alterations to the windows and doors. The biggest change was the reversal of the door hinging on the door to ....
Good progress on the floor. The end will need to be trimmed against the beam and then cloaked by the oak panel when it finally arrives. I can now stand on it to work from. ....
Sanding finished. Before and after shots that show the black stains removed. I then set out the first line of the parquet flooring. I started on this side so the Final Cut piece will be ....
Sanding back the surface on the beams prior to starting to lay the floor.
Time to move inside and make a start on the floor for the office on the upper mezzanine. First I had to finish securing the oak strengthening beams using the M12 threaded bar. Outside I ....
Started the day by trimming the joists in preparation for the oak fascia that has now been ordered but will a 4 to 6 week delivery! Experimented with the oak flooring to see how to ....
As the oak came from the supplier with marks on it I have decided to plan and/or sand it back to fresh wood. The belt sander dealt with it quite quickly. I then installed the ....
As part of the balcony installation I need to install a fascia for the bolts. As I only had one beam left I decided to cut it in half lengthways. What a job! Even cutting ....