December 23
Last day before Christmas. Tomorrow it is shopping and preparing for the festive break. Gave myself the whole day to install the four final ground floor circuits (including switching to the first floor). It went ....
Last day before Christmas. Tomorrow it is shopping and preparing for the festive break. Gave myself the whole day to install the four final ground floor circuits (including switching to the first floor). It went ....
Completing the security lights at the back. Mystaff was not long enough at 5m so I taped it to my longest level to achieve circa 6.5m to make sure all the lights whet in at ....
Security Lights With the sensors in place I spent some of yesterday and most of today up the ladder inside and out and in the attic wiring the security lights. 3 at the front, 3 ....
Not much to show for the cable runs being installed other than the mess at the distribution board gets worse. Erik the electrician will eventually sort it and organise the Consuel (certificate of approval sfor ....
External Light to Utility Door More French spaghetti Light fitted And working