Windows and Timber Frame Installation 5

It does not look much but the beams over the doors are installed and insulated and we have progressed the enclosure for the shutter over the smaller door. I also started installing the breather membrane for the external side of the wall. it will eventually be patterned and the cladding fitted on top.

While Esteban concentrated on the woodwork, I sorted out the service holes for the utility room. Florent cut them but could not get the plastic tubing through before leaving site. I had to clear one or two fallen internal stones (quite normal for these walls) that were blocking the holes and eventually managed to force the tubing through. Part of the problem is that the holes were drilled first from one side then finished from the other so none of them were totally straight.

Now all installed for the heat pump pipework and electrical installation.