I turned up late in the morning to find the new beam had been installed and levelled and most of the external concreting had been done.
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/07/IMG_1082-1024x768.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/07/IMG_1083-1024x768.jpeg)
The rear patio.
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/07/IMG_1084-1024x768.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/07/IMG_1086-1024x768.jpeg)
The workshop and BBQ area that leads into the bike store and around to the patio. There was a bit of concrete left over so we have used it as a base to the pathway next to the house. All looks quite impressive. I now need to get on with the installation of the first floor to enable them to work on the new window openings on the upper floor.
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/07/IMG_1085-1024x768.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/07/IMG_1087-1024x768.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/07/IMG_1088-1024x768.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/07/IMG_1089-1024x768.jpeg)