December 13
Completing the security lights at the back. Mystaff was not long enough at 5m so I taped it to my longest level to achieve circa 6.5m to make sure all the lights whet in at ....
Views of the property from the outside
Completing the security lights at the back. Mystaff was not long enough at 5m so I taped it to my longest level to achieve circa 6.5m to make sure all the lights whet in at ....
Security Lights With the sensors in place I spent some of yesterday and most of today up the ladder inside and out and in the attic wiring the security lights. 3 at the front, 3 ....
More on security. With the first sensor in and working I have set about installing the others through the stone walls. One over the utility door, One more over the rear patio door. All set ....
House security. Having worked out how to wire the sensors to the lights so they work as I want them to, I have set about installing the first over the front door alongside one of ....
Workshop shelves again. With the corner done I fitted the second set of shelves. Rest of the time I have been doing writing which is not very photogenic.
Workshop. Having done the corner the other day I felt duty bound to get the final corner done and the Desmond set of shelves up for Jude. Trimmed in very nicely.
Not much to show for the cable runs being installed other than the mess at the distribution board gets worse. Erik the electrician will eventually sort it and organise the Consuel (certificate of approval sfor ....
After a lo0t of hassling, the fitter finally arrived to turn on the heating system that was installed months previously as it is getting cold to work here. Two teams installed additional pipework and commissioned ....
With all the component finally here I can rearrange the layout of the PV distribution board. The change is necessary as I have had to split the BBQ roof panels from the Car Park roof ....
Security Lights The first of the security lights goes up on the car park.