July 9
Into the master bedroom. First is the insulation. It is hot and sweaty and I am wearing a full face mask to avoid inhaling the dust so not a pleasant job.
Master bedroom including the en-suite and dressing areas
Into the master bedroom. First is the insulation. It is hot and sweaty and I am wearing a full face mask to avoid inhaling the dust so not a pleasant job.
Before fitting the ceiling plasterboard I have to prepare the cabling for the lights and also for the fans. in addition I have to get the fans out to an external point to ventilate the ....
Insulation of most the walls now done and the new corner has been boarded. I need to collect some more insulation tomorrow morning.
With no insulation or vapour barrier I am trying to use my time effectively so the IKEA cabinets have started to be assembled for the utility room. Upstairs I have completed the master bedroom internal ....
The Master bedroom radiators finally installed and tested. I cannot test the Guest Bedroom yet as the circuit includes the towel rail in the bathroom that is not fitted so I have ordered some blanking ....
The last few days have been bank holidays or other distractions and next week I have to take a couple of days off to take Luc to the vet and me for a Covid injection ....
The plasterers have left and they did not complete the painting to the floor as there is eventually going to be a skirting board or it will be behind kitchen cabinets or other furniture. However, ....
More lighting installation. Master bedroom and ensuite. Thermostat refitted and cover plates added to give a more finished look.
Lee and Jacque were so efficient that I asked them to do the decorating as well. Lee manipulated the sander on the ceiling and walls and jaqu got on with cutting in the edges before ....