15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
August 2  |  
July 31  |  
July 25  |  
July 24  |  
July 23  |  

Category: Master Bedroom

Master bedroom including the en-suite and dressing areas

August 2

2 August 20253 August 2025 gjj

The first washing machine (which will eventually end up in the coldstore) is temporarily installed. 30 years old but the Miele is still working well. Time has come for me to mark out and cut ....

Continue reading
Master Bedroom, Master Bedroom En Suite, Utility

July 23

23 July 20253 August 2025 gjj

Lee has now applied a second coat to most of the surfaces. One final one to go then it is sanding prior to painting. The proper bandstand has arrived which is far more secure. With ....

Continue reading
Guest Bedroom, Guest Bedroom En Suite, Lounge, Lower Mezzanine, Master Bedroom, Master Bedroom En Suite, Shower Room, Upper Mezzanine

July 22

22 July 20253 August 2025 gjj

Lee has progressed well even through he is on his own. I occupied myself by building and fitting the wardrobe units for the mezzanine space. The right had sifde was a little tight but I ....

Continue reading
Guest Bedroom, Lower Mezzanine, Master Bedroom

July 10

10 July 20253 August 2025 gjj

With the insulation in place the cabling can be prepared. Took some time as the original design would not work with the positions of the ceiling support bars but eventually I found a spacing that ....

Continue reading
Master Bedroom, Master Bedroom En Suite

July 9

9 July 202513 July 2025 gjj

Into the master bedroom. First is the insulation. It is hot and sweaty and I am wearing a full face mask to avoid inhaling the dust so not a pleasant job.

Continue reading
Master Bedroom

July 5

5 July 202513 July 2025 gjj

Before fitting the ceiling plasterboard I have to prepare the cabling for the lights and also for the fans. in addition I have to get the fans out to an external point to ventilate the ....

Continue reading
Guest Bedroom En Suite, Lower Mezzanine, Master Bedroom

July 1

1 July 202513 July 2025 gjj

Insulation of most the walls now done and the new corner has been boarded. I need to collect some more insulation tomorrow morning.

Continue reading
Master Bedroom

June 6

6 June 202529 June 2025 gjj

With no insulation or vapour barrier I am trying to use my time effectively so the IKEA cabinets have started to be assembled for the utility room. Upstairs I have completed the master bedroom internal ....

Continue reading
Dressing Room, Master Bedroom, Master Bedroom En Suite, Utility

June 2

2 June 202529 June 2025 gjj

A day spent sorting out the door frames for the upstairs rooms

Continue reading
Guest Bedroom En Suite, Master Bedroom, Master Bedroom En Suite

May 15

15 May 202520 May 2025 gjj

The Master bedroom radiators finally installed and tested. I cannot test the Guest Bedroom yet as the circuit includes the towel rail in the bathroom that is not fitted so I have ordered some blanking ....

Continue reading
Guest Bedroom, Master Bedroom

Posts navigation

Older posts

Recent Posts

  • August 2
  • July 31
  • July 25
  • July 24
  • July 23

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.