May 15
The Master bedroom radiators finally installed and tested. I cannot test the Guest Bedroom yet as the circuit includes the towel rail in the bathroom that is not fitted so I have ordered some blanking ....
Master bedroom including the en-suite and dressing areas
The Master bedroom radiators finally installed and tested. I cannot test the Guest Bedroom yet as the circuit includes the towel rail in the bathroom that is not fitted so I have ordered some blanking ....
The last few days have been bank holidays or other distractions and next week I have to take a couple of days off to take Luc to the vet and me for a Covid injection ....
The plasterers have left and they did not complete the painting to the floor as there is eventually going to be a skirting board or it will be behind kitchen cabinets or other furniture. However, ....
More lighting installation. Master bedroom and ensuite. Thermostat refitted and cover plates added to give a more finished look.
Lee and Jacque were so efficient that I asked them to do the decorating as well. Lee manipulated the sander on the ceiling and walls and jaqu got on with cutting in the edges before ....
Not my preferred option but after discussing with Lee I decided to move ahead immediately with the study and lounge complete with its 8.5 metre high ceiling. To do so, I first needed to make ....
Yesterday and today I have been wiring the upstairs circuits to the first socket or switch so that all the circuit tails are fed to the distribution board. I will finish the circuits later but ....
With the concrete removed from the walls the team got on with applying a cost of lime based mortar. Not quite finished but it make a huge impact on the inside to have the walls ....
Tea time over I took these high level shots to show the trenches all filled. Philippe and I then turned our attention to removing the rest of the first floor (or at least the bits ....