15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
May 10  |  
May 6  |  
May 3  |  
April 30  |  
April 29  |  

Author: gjj

May 10

10 May 202512 May 2025 gjj

The last few days have been bank holidays or other distractions and next week I have to take a couple of days off to take Luc to the vet and me for a Covid injection ....

Continue reading
Guest Bedroom, Master Bedroom

May 6

6 May 202512 May 2025 gjj

The plasterers have left and they did not complete the painting to the floor as there is eventually going to be a skirting board or it will be behind kitchen cabinets or other furniture. However, ....

Continue reading
Dressing Room, Guest Bedroom, Kitchen, Master Bedroom, Master Bedroom En Suite

May 3

2 May 202512 May 2025 gjj

Yesterday and today we went to site together to concentrate on planting and tidying the garden. Jude concentrated on planting while I did the digging and lawns. In between times, I got on with the ....

Continue reading
Dressing Room, External, First Floor, Garden

April 30

30 April 20254 May 2025 gjj

As the May bank holidays come around I wanted to finish the lighting so we can truly visualise the spaces. These are the kitchen and dining room.

Continue reading
Dining Room, Ground Floor, Kitchen

April 29

29 April 20254 May 2025 gjj

We finally decided that doing the lounge first would cause an extensive delay to our ability to occupy the house so we have gone back to plan A and I am concentrating on finishing the ....

Continue reading
Dining Room, Dressing Room, First Floor, Ground Floor, Kitchen

April 28

28 April 20254 May 2025 gjj

More lighting installation. Master bedroom and ensuite. Thermostat refitted and cover plates added to give a more finished look.

Continue reading
First Floor, Ground Floor, Kitchen, Master Bedroom, Master Bedroom En Suite

April 24

24 April 20254 May 2025 gjj

Lee and Jacque were so efficient that I asked them to do the decorating as well. Lee manipulated the sander on the ceiling and walls and jaqu got on with cutting in the edges before ....

Continue reading
Cold Store, Dining Room, First Floor, Ground Floor, Kitchen, Master Bedroom, Master Bedroom En Suite, Shower Room, Upper Mezzanine, Utility

April 23

23 April 20254 May 2025 gjj

Not my preferred option but after discussing with Lee I decided to move ahead immediately with the study and lounge complete with its 8.5 metre high ceiling. To do so, I first needed to make ....

Continue reading
Electrics, First Floor, Master Bedroom, Master Bedroom En Suite, Plumbing, Upper Mezzanine

April 22

22 April 20254 May 2025 gjj

Although we did work on Good Friday (as it is not a bank holiday here in France) it was agreed to take a break for the rest of Easter. The stone reveals on the original ....

Continue reading
Ground Floor, Kitchen

April 17

17 April 20254 May 2025 gjj

Lee and Jacque arrive to start the plasterboard jointing. They assure us we will not see the joints after they have finished. They are incredibly quick and accurate with their work and the first coat ....

Continue reading
Cold Store, Dining Room, Ground Floor, Kitchen, Lounge, Shower Room, Utility

Posts navigation

Older posts

Recent Posts

  • May 10
  • May 6
  • May 3
  • April 30
  • April 29

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.