15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
May 19  |  
May 16  |  
May 15  |  
May 14  |  
May 10  |  

Author: gjj

May 19

19 May 202520 May 2025 gjj

Internal Waals in the Dressing Room are finished. External wall still to be done but the radiator is now fitted but not connected. It needs to come off for me to prepare and paint the ....

Continue reading
Dressing Room

May 16

16 May 202520 May 2025 gjj

The car went for a service this morning so time on site was limited. However I managed to get the electrical points and (future wardrobe) light points in to the Dressing Room. The corner will ....

Continue reading
Dressing Room

May 15

15 May 202520 May 2025 gjj

The Master bedroom radiators finally installed and tested. I cannot test the Guest Bedroom yet as the circuit includes the towel rail in the bathroom that is not fitted so I have ordered some blanking ....

Continue reading
Guest Bedroom, Master Bedroom

May 14

14 May 202520 May 2025 gjj

Time to start the external wall cladding upstairs. This is the dressing room, insulated then sealed with a vapour barrier before plasterboarding. A late design change as a water tap is now required for the ....

Continue reading
Dressing Room, Garden

May 10

10 May 202512 May 2025 gjj

The last few days have been bank holidays or other distractions and next week I have to take a couple of days off to take Luc to the vet and me for a Covid injection ....

Continue reading
Guest Bedroom, Master Bedroom

May 6

6 May 202512 May 2025 gjj

The plasterers have left and they did not complete the painting to the floor as there is eventually going to be a skirting board or it will be behind kitchen cabinets or other furniture. However, ....

Continue reading
Dressing Room, Guest Bedroom, Kitchen, Master Bedroom, Master Bedroom En Suite

May 3

2 May 202512 May 2025 gjj

Yesterday and today we went to site together to concentrate on planting and tidying the garden. Jude concentrated on planting while I did the digging and lawns. In between times, I got on with the ....

Continue reading
Dressing Room, External, First Floor, Garden

April 30

30 April 20254 May 2025 gjj

As the May bank holidays come around I wanted to finish the lighting so we can truly visualise the spaces. These are the kitchen and dining room.

Continue reading
Dining Room, Ground Floor, Kitchen

April 29

29 April 20254 May 2025 gjj

We finally decided that doing the lounge first would cause an extensive delay to our ability to occupy the house so we have gone back to plan A and I am concentrating on finishing the ....

Continue reading
Dining Room, Dressing Room, First Floor, Ground Floor, Kitchen

April 28

28 April 20254 May 2025 gjj

More lighting installation. Master bedroom and ensuite. Thermostat refitted and cover plates added to give a more finished look.

Continue reading
First Floor, Ground Floor, Kitchen, Master Bedroom, Master Bedroom En Suite