Category: Lower Mezzanine

Mezzanine leading to the bedroom level

Underfloor Heating 3

16 April 202422 June 2024 gjj

While my two assistants watched on, I rearranged the main staircase components, moving them from the first floor to the upper mezzanine. I also sorted the various lengths of parquet ready for the next few ....

Continue reading
Ground Floor, Lower Mezzanine, Plumbing, Upper Mezzanine

First Floor Flooring 1

15 April 202422 June 2024 gjj

So, with the upper mezzanine done I have moved to the lower mezzanine which is also the first floor and made a start on the oak flooring. I have had to jigsaw the boarding around ....

Continue reading
First Floor, Lower Mezzanine

More Flooring

26 October 202311 February 2024 gjj

With the old warped beams removed from the upper mezzanine, a support beam to level the new oak beams is placed in position. With the first floor and lower mezzanine joists in place I have ....

Continue reading
Attic, First Floor, Lower Mezzanine, Upper Mezzanine

Final Floor Beams 2

21 October 202311 February 2024 gjj

The concrete base has gone into the garden store. And the new replacement beam has been installed over the existing one that gave me concerns at one end. Also te high level beam is in ....

Continue reading
Attic, First Floor, Garden Store, Ground Floor, Kitchen, Lounge, Lower Mezzanine, Upper Mezzanine

Final Floor Beams 1

18 October 202311 February 2024 gjj

Florent's team returned to site today and immediately set about installing the missing floor beams that were recently delivered for both the first floor and attic . By the end of the day the attic ....

Continue reading
Lounge, Lower Mezzanine, Upper Mezzanine

Sand Blasting

25 July 202311 February 2024 gjj

If you have never seen it, this is sand blasting in progress. Jonathan has cleaned the wall (that will be exposed in the Lounge) and is here cleaning up the joists that will remain visible ....

Continue reading
External, First Floor, Lounge, Lower Mezzanine, Upper Mezzanine

Internal Walls Rendered

23 June 202311 February 2024 gjj

With the concrete removed from the walls the team got on with applying a cost of lime based mortar. Not quite finished but it make a huge impact on the inside to have the walls ....

Continue reading
Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Floor Removal and Tidying Up

14 May 202311 February 2024 gjj

Tea time over I took these high level shots to show the trenches all filled. Philippe and I then turned our attention to removing the rest of the first floor (or at least the bits ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden, Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Making Hay 6

16 April 202311 February 2024 gjj

Sunday was a full day working with la Métairie to finally clear the upper floor. All gone at last. Just a quick sweep to finish off.

Continue reading
Guest Bedroom, Lower Mezzanine, Master Bedroom, Upper Mezzanine

Making Hay 3

23 March 202311 February 2024 gjj

So a solution to the hay problem has been found. The lovely people at Le Refuge La Métairie which houses horses, donkeys and goats offered to come over to do the hard work of moving ....

Continue reading
External, Lounge, Lower Mezzanine, Upper Mezzanine

Posts navigation

Older posts

Recent Posts

  • May 19
  • May 16
  • May 15
  • May 14
  • May 10

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.