Mezzanine leading to the bedroom level

July 23

23 July 20253 August 2025 gjj

Lee has now applied a second coat to most of the surfaces. One final one to go then it is sanding prior to painting. The proper bandstand has arrived which is far more secure. With ....

Continue reading
Guest Bedroom, Guest Bedroom En Suite, Lounge, Lower Mezzanine, Master Bedroom, Master Bedroom En Suite, Shower Room, Upper Mezzanine

July 22

22 July 20253 August 2025 gjj

Lee has progressed well even through he is on his own. I occupied myself by building and fitting the wardrobe units for the mezzanine space. The right had sifde was a little tight but I ....

Continue reading
Guest Bedroom, Lower Mezzanine, Master Bedroom

July 8

8 July 202513 July 2025 gjj

With the en-suite done, it is into the guest bedroom. Cabling for lights done so up with the first plasterboard. By mid afternoon the ceiling is up. The holes for the light have not been ....

Continue reading
Guest Bedroom, Lower Mezzanine

July 5

5 July 202513 July 2025 gjj

Before fitting the ceiling plasterboard I have to prepare the cabling for the lights and also for the fans. in addition I have to get the fans out to an external point to ventilate the ....

Continue reading
Guest Bedroom En Suite, Lower Mezzanine, Master Bedroom

May 31

31 May 202529 June 2025 gjj

Closing out some fiddly jobs while waiting for an IKEA delivery. Internal walls of the cupboard space on the mezzanine walkway prepared and used as storage for the first floor ceiling insulation. IKEA delivery arrived ....

Continue reading
Kitchen, Lower Mezzanine

May 26

26 May 202529 June 2025 gjj

Before installing the plasterboard I need to check all the wiring is in. Here I have temporarily hung the lights over the mezzanine walkway and one lamp for the office mezzanine.

Continue reading
Lower Mezzanine, Upper Mezzanine

Underfloor Heating 3

16 April 202422 June 2024 gjj

While my two assistants watched on, I rearranged the main staircase components, moving them from the first floor to the upper mezzanine. I also sorted the various lengths of parquet ready for the next few ....

Continue reading
Ground Floor, Lower Mezzanine, Plumbing, Upper Mezzanine

First Floor Flooring 1

15 April 202422 June 2024 gjj

So, with the upper mezzanine done I have moved to the lower mezzanine which is also the first floor and made a start on the oak flooring. I have had to jigsaw the boarding around ....

Continue reading
First Floor, Lower Mezzanine

More Flooring

26 October 202311 February 2024 gjj

With the old warped beams removed from the upper mezzanine, a support beam to level the new oak beams is placed in position. With the first floor and lower mezzanine joists in place I have ....

Continue reading
Attic, First Floor, Lower Mezzanine, Upper Mezzanine

Final Floor Beams 2

21 October 202311 February 2024 gjj

The concrete base has gone into the garden store. And the new replacement beam has been installed over the existing one that gave me concerns at one end. Also te high level beam is in ....

Continue reading
Attic, First Floor, Garden Store, Ground Floor, Kitchen, Lounge, Lower Mezzanine, Upper Mezzanine

Posts navigation

Older posts

Recent Posts

  • August 2
  • July 31
  • July 25
  • July 24
  • July 23

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.