It is Monday morning and although I came over on Saturday to see what was happening I forgot to take a photo. They did turn up and brought enough materials to finish as can be seen below. The different shade of the finish is due to the different shades of sand between the first, second and third deliveries.

So today I played with the electrics and the internet. I have added a box to the distribution board for the heat pump and compressor installation and wired some plugs temporarily in the attic to enable me to connect the satellite cable and the internet to the TV, update the receiver software and download the channels. It all seems to work fine.

Tomorrow the travertine is due to arrive so I have also cleared up and prepared for it.