Category: Lounge

Concrete Floor Goes In

13 June 202311 February 2024 gjj

When I arrived on site it was about an hour before the concrete was due to arrive and I found four builders busy on the separation wall which, in a morning, they had just about ....

Continue reading
Entrance Gates and Arch, External, Kitchen, Lounge, Utility

PV Panels And Another Cable

2 June 202311 February 2024 gjj

After pouring the concrete for the lintel above the door, the team got back to floor preparation laying the reinforcing bar for the concrete pour. We wanted to organise it for this week but the ....

Continue reading
Car Park, Entrance Gates and Arch, External, Kitchen, Lounge, Utility

More Floor and Lintels

1 June 202311 February 2024 gjj

Yesterday we had a visit from the windows supplier to agree the height of the lintels above the new door in the utility room and for the existing windows. Florent can now get on with ....

Continue reading
Kitchen, Lounge, Utility

Ground Floor Begins

30 May 202311 February 2024 gjj

Florent and Esteban have levelled most of the floor and have begun to install the insulation over a damp proof course that forms the sublayer of the ground floor. The wooden boards are in place ....

Continue reading
Lounge

Electrics and External Progress

26 May 202311 February 2024 gjj

The temporary barrier between our garden and Henri's has been taken down in preparation for laying the foundations of the wall that has to be built there. So for a while the dogs cannot be ....

Continue reading
BBQ/Workshop, Car Park, Entrance Gates and Arch, External, Garden, Kitchen, Lounge, Utility

Utility Door Opening

24 May 202311 February 2024 gjj

The pile of chalk is for blinding the levelled ground but Florent is off site today. Esteban started knocking through the new doorway in the utility room where the old chimney used to be. Meanwhile ....

Continue reading
Car Park, External, Lounge, Utility

BBQ and Services

22 May 202311 February 2024 gjj

When I arrived this morning after leaving early on Friday I was pleased to find the BBQ and Workshop area had been prepared and compacted along with the cleanse and preparation of the bike store. ....

Continue reading
BBQ/Workshop, Bike Store, Entrance Gates and Arch, External, Garden, Kitchen, Lounge, Utility

Internal Breakout

19 May 202311 February 2024 gjj

With the pathway down to the house, The contractors concentrated on breaking out and levelling the internal floor and removing the internal wall. They did not take it all down as there was concern about ....

Continue reading
Kitchen, Lounge, Utility

Floor Removal and Tidying Up

14 May 202311 February 2024 gjj

Tea time over I took these high level shots to show the trenches all filled. Philippe and I then turned our attention to removing the rest of the first floor (or at least the bits ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden, Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Making Hay 3

23 March 202311 February 2024 gjj

So a solution to the hay problem has been found. The lovely people at Le Refuge La Métairie which houses horses, donkeys and goats offered to come over to do the hard work of moving ....

Continue reading
External, Lounge, Lower Mezzanine, Upper Mezzanine

Posts navigation

Older posts
Newer posts

Recent Posts

  • July 2
  • July 1
  • June 30
  • June 28
  • June 27

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.