Florent and Esteban have levelled most of the floor and have begun to install the insulation over a damp proof course that forms the sublayer of the ground floor. The wooden boards are in place for the eventual pouring of the concrete.
Florent and Esteban have levelled most of the floor and have begun to install the insulation over a damp proof course that forms the sublayer of the ground floor. The wooden boards are in place for the eventual pouring of the concrete.