Skip to content
  • 04:30
  • Wednesday
  • 2 July 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
  • M-B Importation
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
June 28  |  
June 27  |  
June 25  |  
June 24  |  
June 19  |  
Master Bedroom En Suite

June 28

Full story
Master Bedroom En Suite

June 27

Full story
Guest Bedroom

June 25

Full story

Staircase 1

17 January 202411 February 2024 gjj

I had to coordinate Florent to come to site with his Manitou extending forklift to get the staircases into the house. They arrived flat packed and were then deposited outside the gates for me to ....

Continue reading
Staircase

Electric Gates 2

16 January 202411 February 2024 gjj

By lunchtime, Erik had finished the installation. By then I had installed the lock plate for the new Yale lock and provided a temporary electrical supply for him to test the doors. So finally, we ....

Continue reading
Entrance Gates and Arch

Electric Gates 1

15 January 202411 February 2024 gjj

Back or no back, the gates needed to be installed. Actually the medication has made me much more mobile but I am still cautious about doing anything that exerts too much strain on it. Eric ....

Continue reading
Entrance Gates and Arch

Enough is Enough (For my Back)

2 January 202411 February 2024 gjj

No photos as I was in too much pain to take them. I drove to site thinking my back was feeling better only to find that driving was not a good idea. I had to ....

Continue reading
General Notes

Windows and Timber Frame Installation 7

22 December 202311 February 2024 gjj

Friday before Christmas and I am closing the site until the New Year to have a break and to allow my back to get better. Esteban once again concentrated on the structure over the main ....

Continue reading
Timber Frame, Windows

Windows and Timber Frame Installation 6

21 December 202311 February 2024 gjj

Yesterday and today I continued with the framework around the window above the smaller doorway while Esteban bolted the high level timbers to the walls above the larger doorway. Fitted a temporary cover to the ....

Continue reading
Windows

Windows and Timber Frame Installation 5

19 December 202311 February 2024 gjj

It does not look much but the beams over the doors are installed and insulated and we have progressed the enclosure for the shutter over the smaller door. I also started installing the breather membrane ....

Continue reading
Utility, Windows

Windows Discussion

15 December 202311 February 2024 gjj

No work or photos today, just talking. Despite the problems with the windows the company (Socover) are determined to get things right for us and recognise that errors have been made. A supplementary meeting has ....

Continue reading
General Notes, Windows

Windows and Timber Frame Installation 4

14 December 202311 February 2024 gjj

First section of plywood wall covering fitted. Tomorrow the windows company are coming for a meeting to discuss the issues. Other than the ones I have written about, there is also a problem that neither ....

Continue reading
Windows

Windows and Timber Frame Installation 3, The Yale Lock

13 December 202311 February 2024 gjj

While Esteban and I continued Buiding and in part insulation the wall and enclosures for the electric shutters, Xavier and Kevin progressed the door installations. Here you can see the fixed window in the kitchen, ....

Continue reading
Windows

Posts pagination

Previous page Page 1 … Page 28 Page 29 Page 30 … Page 45 Next page

Recent Posts

  • June 28
  • June 27
  • June 25
  • June 24
  • June 19

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.