Windows and Timber Frame Installation 2
Second day of the installation and Esteban and I pushed on with the door openings. Xavier and Kevin got on with the installation of the utility room door followed by the fixed window and door ....
Second day of the installation and Esteban and I pushed on with the door openings. Xavier and Kevin got on with the installation of the utility room door followed by the fixed window and door ....
Today is Monday. Following a couple of short discussions on the revision to the windows quote last week, I received a revised price and arrangement via email and then a phone call on Thursday (7th) ....
A combination of lots of issues including weather, lack of approval and my back has kept me at home planning for some time but today I am on site again for the first time since ....
After our trip to the UK I am finally back on site to see that in my absence Florent has been back to install the internet fibre box connection through the wall and in a ....
A little worrying as we are off to the UK next week and the site is now flooding. The ditch at the back of the property has overflowed into the garden preventing any further work. ....
With the water continuing to fall, Florent has only been able to tidy up the paths and fencing areas and has now left site until the sewage approval is received. timing is OK as we ....
The weather is turning very wet so I am pleased the fencing is now secured and looking good. I am waiting on approval for the sewage (assainissement) system before it can be installed so work ....
to maintain the flooring for the window installation I had to lift the temporary floor I had fitted (22mm) that is the attic floor and replace it with thinner (12mm) boarding that is destined for ....
Dancing posts and gate cemented in. Lead flashing on storage roofs and the final joists are fitted.
The new oak beams are laid in place and inserted into new holes in the wall before being enclosed. A stairwell space needs to be made but I can get a good idea of the ....