Skip to content
  • 06:50
  • Friday
  • 9 May 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
May 3  |  
April 30  |  
April 29  |  
April 28  |  
April 24  |  
Garden

May 3

Full story
Kitchen

April 30

Full story
Dressing Room

April 29

Full story

Drilling at Home

23 September 202311 February 2024 gjj

The inverters for the photovoltaic panels need to be fixed to the rails on which the panels sit to protect them from the weather. The fittings they sent originally were not correct and they have ....

Continue reading
External

Attic 2

20 September 202311 February 2024 gjj

Florent's team of workers have left for the moment as we are waiting on information for the sewage treatment plant before continuing so I am on site alone. I have finished the last part of ....

Continue reading
Attic

Car Park 1 and Attic 1

18 September 202311 February 2024 gjj

What a miserable day! Almost non-stop rain during the morning which flooded the site making it difficult to do the concreting of the bases for the pergola posts for the car park. In the brief ....

Continue reading
Attic, Car Park

Fibre Optic Cable

17 September 202311 February 2024 gjj

The only gaine (conduit) I installed without pre-wiring was the fibre optic. Issues with Orange (who manage the infrastructure in France) left me with no cable to insert. I have since bought my own to ....

Continue reading
External

Windows 5 (Cills)

16 September 202311 February 2024 gjj

With the jointing finished and the embedded bush root finally dead, we were able to cut out the exposed section, drill it and fill it with more herbicide just in case and finish off the ....

Continue reading
Bike Store, External, Windows

External Thresholds

15 September 202311 February 2024 gjj

After a bit of going and frying with the windows supplier we finally have agreed sizes for the thresholds for the doors and the large fixed window. Utility door with muck ready to spread, work ....

Continue reading
External

Jointing 11 (The End!)

13 September 202311 February 2024 gjj

Finally the jointing is finished. Scaffold down at the front to reveal its new face and the internal wall also cleared (although still a bit damp as it is inside). The top of the attic ....

Continue reading
Attic, External, Lounge

Jointing 10

11 September 202311 February 2024 gjj

Front wall finished today (still to be brushed off) and a start made on the internal wall. Almost there.

Continue reading
External, Lounge

Jointing 9

8 September 202311 February 2024 gjj

Rear wall finished and dry. End wall finished and still wet at the base. Good progress on the front wall.

Continue reading
External

PV Panels 2

8 September 202311 February 2024 gjj

As part of clearing the car parking I have had to move all the PV panels, not just those for the BBQ area. Discovered a second one damaged unfortunately so that will also need replacing. ....

Continue reading
BBQ/Workshop, Car Park

Posts pagination

Previous page Page 1 … Page 29 Page 30 Page 31 … Page 42 Next page

Recent Posts

  • May 3
  • April 30
  • April 29
  • April 28
  • April 24

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.