Master Bedroom En Suite

June 28

Full story
Master Bedroom En Suite

June 27

Full story
Guest Bedroom

June 25

Full story

Windows and Timber Frame Installation 2

12 December 202311 February 2024 gjj

Second day of the installation and Esteban and I pushed on with the door openings. Xavier and Kevin got on with the installation of the utility room door followed by the fixed window and door ....

Continue reading
Windows

Windows and Timber Frame Installation 1

11 December 202311 February 2024 gjj

Today is Monday. Following a couple of short discussions on the revision to the windows quote last week, I received a revised price and arrangement via email and then a phone call on Thursday (7th) ....

Continue reading
Windows

Windows! and Electrical Distribution Panel 1

6 December 202311 February 2024 gjj

A combination of lots of issues including weather, lack of approval and my back has kept me at home planning for some time but today I am on site again for the first time since ....

Continue reading
Utility

Back to Work?

21 November 202311 February 2024 gjj

After our trip to the UK I am finally back on site to see that in my absence Florent has been back to install the internet fibre box connection through the wall and in a ....

Continue reading
External

Water, Water Everywhere

5 November 202311 February 2024 gjj

A little worrying as we are off to the UK next week and the site is now flooding. The ditch at the back of the property has overflowed into the garden preventing any further work. ....

Continue reading
External, Garden

Site Closure

3 November 202311 February 2024 gjj

With the water continuing to fall, Florent has only been able to tidy up the paths and fencing areas and has now left site until the sewage approval is received. timing is OK as we ....

Continue reading
External, Garden

Electrics and Fencing

2 November 202311 February 2024 gjj

The weather is turning very wet so I am pleased the fencing is now secured and looking good. I am waiting on approval for the sewage (assainissement) system before it can be installed so work ....

Continue reading
External, Garden

Floor Arranging

1 November 202311 February 2024 gjj

to maintain the flooring for the window installation I had to lift the temporary floor I had fitted (22mm) that is the attic floor and replace it with thinner (12mm) boarding that is destined for ....

Continue reading
Attic, First Floor

More Fencing and Floorboards

31 October 202311 February 2024 gjj

Dancing posts and gate cemented in. Lead flashing on storage roofs and the final joists are fitted.

Continue reading
Attic, Bike Store, External, First Floor, Garden

Office Mezzanine, Paths and Enclosures

30 October 202311 February 2024 gjj

The new oak beams are laid in place and inserted into new holes in the wall before being enclosed. A stairwell space needs to be made but I can get a good idea of the ....

Continue reading
External, Upper Mezzanine

Posts pagination

Previous page Page 1 … Page 29 Page 30 Page 31 … Page 45 Next page

Recent Posts

  • June 28
  • June 27
  • June 25
  • June 24
  • June 19

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.