BBQ Guttering 1

12 March 202414 March 2024 gjj

I dismantled my supports to paint them with a protective black stain prior to installing them. I used the same stain to finish off the cut sections of the timber frame. Here are before and ....

Continue reading
BBQ/Workshop, Timber Frame

Tidying Up

1 March 20244 March 2024 gjj

Another miserable, wet day. Not an issue as I planned to work inside today. First job was a serious tidy up as I need to get the ground floor cleared and ready for the underfloor ....

Continue reading
First Floor, Timber Frame

Windows and Timber Frame Installation 21

29 February 20244 March 2024 gjj

Alain Chergui arrived first thing and delivered back the left over tiles from the floor he has just installed. The tiles are well travelled. We bought them initially for the new floor at the Chai ....

Continue reading
Timber Frame

Windows and Timber Frame Installation 20

28 February 20244 March 2024 gjj

The morning began dry and bright so I was able to work on the cladding over the smaller set of doors. I managed to install the piece on the left easily enough but the right ....

Continue reading
Timber Frame

Windows and Timber Frame Installation 19

27 February 20244 March 2024 gjj

More rain stopped me working yesterday but today it is relatively dry. I used the time yesterday to visit a metal worker to discuss the metal trays for the window cills and catch up on ....

Continue reading
Timber Frame

Windows and Timber Frame Installation 18

23 February 20244 March 2024 gjj

The weather is not good again today and I need to leave early to collect some furniture near Poitiers. The supplied windows do not have an extended cill tray so I will have to organise ....

Continue reading
Timber Frame

Windows and Timber Frame Installation 17

22 February 202428 February 2024 gjj

The weather continues to be a problem and working outside is impossible most of the time at the moment. This morning I had to be on site early to let the window company in to ....

Continue reading
Timber Frame

Windows and Timber Frame Installation 16

21 February 202423 February 2024 gjj

I started at home this morning catching up with paperwork so only managed the afternoon today. However I made good progress with the cladding around one of the windows.

Continue reading
Timber Frame

Windows and Timber Frame Installation 15

20 February 202423 February 2024 gjj

With the plywood installed, I started applying the breathable membrane and once it was completed finished off by fixing the battens to support the timber cladding. I even managed to put up one piece of ....

Continue reading
Timber Frame

Windows and Timber Frame Installation 14

19 February 202423 February 2024 gjj

After finishing the pear tree I started back on the horizontal supports which are now all in. So I have begun installing more of the plywood. Meanwhile, Xavier and Kevin of Socover are back on ....

Continue reading
Timber Frame

Posts navigation

Older posts

Recent Posts

  • May 19
  • May 16
  • May 15
  • May 14
  • May 10

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.