Friday before Christmas and I am closing the site until the New Year to have a break and to allow my back to get better.
Esteban once again concentrated on the structure over the main doors to provide the openings for the first floor windows so they can be fitted in the New Year.
I concentrated on filling the gaps between the walls and the timber frame with PU foam to exclude drafts and for insulation. As the walls are not straight or vertical in places it took some time and a lot of foam.
Internal view from the lounge at the future high level windows.
The front elevation is really taking shape.