July 8
With the en-suite done, it is into the guest bedroom. Cabling for lights done so up with the first plasterboard.


By mid afternoon the ceiling is up. The holes for the light have not been inserted yet as Lee can joint much quicker without them. I will drill them out later to pull the cable through (assuming I can find them OK).


The rest of the day is spent on boarding more of the mezzanine walkway.