15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
June 28  |  
June 27  |  
June 25  |  
June 24  |  
June 19  |  

Category: Dressing Room

June 6

6 June 202529 June 2025 gjj

With no insulation or vapour barrier I am trying to use my time effectively so the IKEA cabinets have started to be assembled for the utility room. Upstairs I have completed the master bedroom internal ....

Continue reading
Dressing Room, Master Bedroom, Master Bedroom En Suite, Utility

May 23

23 May 202529 June 2025 gjj

Vapour barrier and plasterboard in the dressing room. I have repositioned the shutter controls to inside the rebate for the window as it is more convenient than on the outer wall as in this room, ....

Continue reading
Dressing Room, First Floor

May 22

22 May 202529 June 2025 gjj

With the plasterboard pile renewed I can get on with the upstairs. Here in the dressing room I have insulated and prepared the tapes to support the vapour barrier Likewise in the Master en suite ....

Continue reading
Dressing Room, First Floor, Master Bedroom En Suite

May 19

19 May 20256 June 2025 gjj

Internal Walls in the Dressing Room are finished. External wall still to be done but the radiator is now fitted but not connected. It needs to come off for me to prepare and paint the ....

Continue reading
Dressing Room

May 16

16 May 202520 May 2025 gjj

The car went for a service this morning so time on site was limited. However I managed to get the electrical points and (future wardrobe) light points in to the Dressing Room. The corner will ....

Continue reading
Dressing Room

May 14

14 May 202520 May 2025 gjj

Time to start the external wall cladding upstairs. This is the dressing room, insulated then sealed with a vapour barrier before plasterboarding. A late design change as a water tap is now required for the ....

Continue reading
Dressing Room, Garden

May 6

6 May 202512 May 2025 gjj

The plasterers have left and they did not complete the painting to the floor as there is eventually going to be a skirting board or it will be behind kitchen cabinets or other furniture. However, ....

Continue reading
Dressing Room, Guest Bedroom, Kitchen, Master Bedroom, Master Bedroom En Suite

May 3

2 May 202512 May 2025 gjj

Yesterday and today we went to site together to concentrate on planting and tidying the garden. Jude concentrated on planting while I did the digging and lawns. In between times, I got on with the ....

Continue reading
Dressing Room, External, First Floor, Garden

April 29

29 April 20254 May 2025 gjj

We finally decided that doing the lounge first would cause an extensive delay to our ability to occupy the house so we have gone back to plan A and I am concentrating on finishing the ....

Continue reading
Dining Room, Dressing Room, First Floor, Ground Floor, Kitchen