June 6
With no insulation or vapour barrier I am trying to use my time effectively so the IKEA cabinets have started to be assembled for the utility room. Upstairs I have completed the master bedroom internal ....
With no insulation or vapour barrier I am trying to use my time effectively so the IKEA cabinets have started to be assembled for the utility room. Upstairs I have completed the master bedroom internal ....
Vapour barrier and plasterboard in the dressing room. I have repositioned the shutter controls to inside the rebate for the window as it is more convenient than on the outer wall as in this room, ....
With the plasterboard pile renewed I can get on with the upstairs. Here in the dressing room I have insulated and prepared the tapes to support the vapour barrier Likewise in the Master en suite ....
Internal Walls in the Dressing Room are finished. External wall still to be done but the radiator is now fitted but not connected. It needs to come off for me to prepare and paint the ....
The car went for a service this morning so time on site was limited. However I managed to get the electrical points and (future wardrobe) light points in to the Dressing Room. The corner will ....
Time to start the external wall cladding upstairs. This is the dressing room, insulated then sealed with a vapour barrier before plasterboarding. A late design change as a water tap is now required for the ....
The plasterers have left and they did not complete the painting to the floor as there is eventually going to be a skirting board or it will be behind kitchen cabinets or other furniture. However, ....
Yesterday and today we went to site together to concentrate on planting and tidying the garden. Jude concentrated on planting while I did the digging and lawns. In between times, I got on with the ....
We finally decided that doing the lounge first would cause an extensive delay to our ability to occupy the house so we have gone back to plan A and I am concentrating on finishing the ....