
June 6
With no insulation or vapour barrier I am trying to use my time effectively so the IKEA cabinets have started to be assembled for the utility room.


Upstairs I have completed the master bedroom internal spine wall, prepared the doorway into the dressing room and pre-cut the hydro sheets ready for when they can be installed in the master bedroom en-suite.


