July 5
Before fitting the ceiling plasterboard I have to prepare the cabling for the lights and also for the fans. in addition I have to get the fans out to an external point to ventilate the rooms properly. Temporarily I have fixed the flexible tubing to exhaust through the eaves line in the master bedroom en-suite;


and the guest bedroom en-suite. Eventually I will drill a hole through the wall and use rigid tubing to protect the airflow better.


With the master bedroom external wall finished I ache turned my attention to the mezannine walkway as Would like this to be jointed and decorated with the rooms.





The light switches outside the master bedroom door were a bit difficult to fit as the wires were tights and the space for the position of the switches was determined by the metal structure. The architraving will be tight but it looks as if it will be OK.