June 16
En-suite for the guest bedroom is finished including filling in the gaps between the boards before Lee and Jacq arrive to do the jointing and decorating. Good progress also made in the guest bedroom itself. ....
En-suite for the guest bedroom is finished including filling in the gaps between the boards before Lee and Jacq arrive to do the jointing and decorating. Good progress also made in the guest bedroom itself. ....
I have redesigned to the fan and ventilation unit to get some shelving into the wall cupboard and it works quite well. The base unit has gone in but the outlet pipe still needs to ....
I need to design a support system in the wall before closing it off to ensure the towel rail does not get pulled off just plasterboard. So I have inserted a structure but not yet ....
The Master Bedroom is still to be finished but with the delivery of the hydro boards I have turned my attention to the two en-suites. After completing the wiring and the insulation, the boards can ....