Category: Shower Room
August 21
With the oak floors sanded and treated we can start moving items into the two bedrooms Shower room taking shape. Removable panel below the sink just in case.
August 16
As the tiling progresses I had to empty the shower room of its component parts. For some unfettered access.
August 13
More work on the shower. Note the quality of engineering drawings on the wall.
August 12
Utility room taps and sink. Hmm, that pair of sockets will have to go. We had to change the position of the utility sinks due to the orientation of the marble so the sockets that ....
August 11
Time to concentrate on getting a shower and toilet installed before the move.
July 25
A trip to collect some wood for a solid solution and then fit it and cover it with nano board ready for tiling. Lee has prioritised the painting of the dressing room so that I ....