April 16
The final preparation required the floors to be swept, hoovered and washed to lift the dust. Only then was I able to safely tape a protective cover over the travertine (which is highly absorbent and ....
The final preparation required the floors to be swept, hoovered and washed to lift the dust. Only then was I able to safely tape a protective cover over the travertine (which is highly absorbent and ....
I took Friday off from building to work with Jude on the garden digging the beds (again) to clear weeds and plant both some of our existing and some new plants. We have now planted ....
More plasterboarding in the cold store. The interior walls get insulated to separate the cold store from the rest of the house. Over the insulation the plasterboards are fitted. The final piece is over the ....
First job is to paint behind the second column. First coat up and drying. While the paint dries the plasterboard is installed (uninsulated as it is the cold room). Some of the offcuts are used ....
Time to hit the cold store. I need to finish the preparation for the tidy up of electric cables. All a bit of a mess at the moment and after a chat with Erik when ....