Mezzanine leading to the office area

Upper Mezzanine Floor 2

5 March 202414 March 2024 gjj

I need to cut some of the oak beam ends and they are heavy. Much too heavy to balance on the chop saw now it is on its stand. So, a sawhorse is required and ....

Continue reading
Upper Mezzanine

Upper Mezzanine Floor 1

4 March 202414 March 2024 gjj

Just a half day on site today and it was slow progress as I have been cutting and drilling oak beams. Only on photo of the first section of beam cut, drilled and positioned under ....

Continue reading
Upper Mezzanine

Office Mezzanine, Paths and Enclosures

30 October 202311 February 2024 gjj

The new oak beams are laid in place and inserted into new holes in the wall before being enclosed. A stairwell space needs to be made but I can get a good idea of the ....

Continue reading
External, Upper Mezzanine

More Flooring

26 October 202311 February 2024 gjj

With the old warped beams removed from the upper mezzanine, a support beam to level the new oak beams is placed in position. With the first floor and lower mezzanine joists in place I have ....

Continue reading
Attic, First Floor, Lower Mezzanine, Upper Mezzanine

Final Floor Beams 2

21 October 202311 February 2024 gjj

The concrete base has gone into the garden store. And the new replacement beam has been installed over the existing one that gave me concerns at one end. Also te high level beam is in ....

Continue reading
Attic, First Floor, Garden Store, Ground Floor, Kitchen, Lounge, Lower Mezzanine, Upper Mezzanine

Final Floor Beams 1

18 October 202311 February 2024 gjj

Florent's team returned to site today and immediately set about installing the missing floor beams that were recently delivered for both the first floor and attic . By the end of the day the attic ....

Continue reading
Lounge, Lower Mezzanine, Upper Mezzanine

The Pergolas Arrive

27 July 202311 February 2024 gjj

The Douglas Fir pergolas have arrived together with the roofing materials. The three wheeled forklift was an amazing machine that could turn its wheels through 90 degrees to access difficult positions. Each pergola has been ....

Continue reading
BBQ/Workshop, External, Upper Mezzanine

Sand Blasting

25 July 202311 February 2024 gjj

If you have never seen it, this is sand blasting in progress. Jonathan has cleaned the wall (that will be exposed in the Lounge) and is here cleaning up the joists that will remain visible ....

Continue reading
External, First Floor, Lounge, Lower Mezzanine, Upper Mezzanine

External Concreting Preparation

30 June 202311 February 2024 gjj

The wall rendering is finished. The concrete support is re-shuttered to be raised to the new height. The hole to receive the far end of the new beam has been raised and moved to get ....

Continue reading
BBQ/Workshop, Bike Store, External, Garden, Garden Store, Lounge, Upper Mezzanine

Internal Walls Rendered

23 June 202311 February 2024 gjj

With the concrete removed from the walls the team got on with applying a cost of lime based mortar. Not quite finished but it make a huge impact on the inside to have the walls ....

Continue reading
Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 2
  • July 31
  • July 25
  • July 24
  • July 23

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.