The Pergolas Arrive

27 July 202311 February 2024 gjj

The Douglas Fir pergolas have arrived together with the roofing materials. The three wheeled forklift was an amazing machine that could turn its wheels through 90 degrees to access difficult positions. Each pergola has been ....

Continue reading
BBQ/Workshop, External, Upper Mezzanine

Sand Blasting

25 July 202311 February 2024 gjj

If you have never seen it, this is sand blasting in progress. Jonathan has cleaned the wall (that will be exposed in the Lounge) and is here cleaning up the joists that will remain visible ....

Continue reading
External, First Floor, Lounge, Lower Mezzanine, Upper Mezzanine

External Concreting Preparation

30 June 202311 February 2024 gjj

The wall rendering is finished. The concrete support is re-shuttered to be raised to the new height. The hole to receive the far end of the new beam has been raised and moved to get ....

Continue reading
BBQ/Workshop, Bike Store, External, Garden, Garden Store, Lounge, Upper Mezzanine

Internal Walls Rendered

23 June 202311 February 2024 gjj

With the concrete removed from the walls the team got on with applying a cost of lime based mortar. Not quite finished but it make a huge impact on the inside to have the walls ....

Continue reading
Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Floor Removal and Tidying Up

14 May 202311 February 2024 gjj

Tea time over I took these high level shots to show the trenches all filled. Philippe and I then turned our attention to removing the rest of the first floor (or at least the bits ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden, Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Making Hay 6

16 April 202311 February 2024 gjj

Sunday was a full day working with la Métairie to finally clear the upper floor. All gone at last. Just a quick sweep to finish off.

Continue reading
Guest Bedroom, Lower Mezzanine, Master Bedroom, Upper Mezzanine

Making Hay 3

23 March 202311 February 2024 gjj

So a solution to the hay problem has been found. The lovely people at Le Refuge La Métairie which houses horses, donkeys and goats offered to come over to do the hard work of moving ....

Continue reading
External, Lounge, Lower Mezzanine, Upper Mezzanine

Filling Time Cleaning Up

6 March 20231 July 2024 gjj

Still waiting on planning so negotiations continue with suppliers. We think we have found a trusted contractor to do the majority of the heavy work but with rising prices it is becoming clear that I ....

Continue reading
Garden, Upper Mezzanine

More Measuring

19 December 202211 February 2024 gjj

Every time I try to draw a part of the plan I discover that I am missing a dimension! So, at least once a week I pop over to the site with measuring equipment to ....

Continue reading
External, Garden, Lounge, Lower Mezzanine, Upper Mezzanine

Quotations Begin

6 October 202211 February 2024 gjj

With the old house sold it is time to get on with organising the reconstruction for the new property. Today saw the first visitor to arrive to give quotations for making good the walls where ....

Continue reading
Entrance Gates and Arch, External, Garden, Guest Bedroom, Master Bedroom, Upper Mezzanine

Posts navigation

Newer posts

Recent Posts

  • May 23
  • May 22
  • May 21
  • May 19
  • May 16

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.