The Douglas Fir pergolas have arrived together with the roofing materials. The three wheeled forklift was an amazing machine that could turn its wheels through 90 degrees to access difficult positions. Each pergola has been bundled together so installation should be simplified.
Outside the cleaning and preparation fo the rear wall is making progress. Scaffolding has been installed over the two small sotres to allow access to the end wall. The mezzanine beam cleaning is finished.