First Floor Joists 6
I have laid the floor in the right direction this time as it is just enough for the scaffolding to fit onto. View from the bedroom window.
I have laid the floor in the right direction this time as it is just enough for the scaffolding to fit onto. View from the bedroom window.
First section of the floor installed. Florent will also need this side of the building to ache a floor for accessing the original windows that need their lintels raising to get the electric volets in ....
Trial holes for installing the sewage (assainissement) system were dug and surprise, surprise they are full of water. Consequently the system cannot be a standard one but instead an electrically driven micro station. Cost will ....
With the floor in, the windows can be started at the back of the house. To get the scaffolding up outside the eventually pathway needed to be part laid. By the end of the day ....
I am working hard to keep ahead of Florent and his team. they need a floor in to be able to set scaffolding and work on opening the upstairs windows. so once I had enough ....
The first floor sits between new joists and above the existing beam. First the wall joists (double) were installed and bolted with a special resin. Than the hangers added. Despite all my planning, the bolts ....
I turned up late in the morning to find the new beam had been installed and levelled and most of the external concreting had been done. The rear patio. The workshop and BBQ area that ....
The wall rendering is finished. The concrete support is re-shuttered to be raised to the new height. The hole to receive the far end of the new beam has been raised and moved to get ....
With the concrete removed from the walls the team got on with applying a cost of lime based mortar. Not quite finished but it make a huge impact on the inside to have the walls ....
Because I am taking a relaxed approach and only visiting on occasion and not daily, errors begin to occur. When I arrived today I was upset to see what looks to be cement used as ....