First Floor

May 3

Full story
Kitchen

April 30

Full story
Ground Floor

April 29

Full story

Windows and Timber Frame Installation 9

7 February 202411 February 2024 gjj

This morning I finished off the plywood cladding and then applied the breather paper to the upper section. I then spent the afternoon finishing the fitting the battens in preparation for the cladding. The right ....

Continue reading
First Floor, Ground Floor, Timber Frame

Windows and Timber Frame Installation 8

6 February 202411 February 2024 gjj

First thing this morning was a meeting on resolving the issues with the windows with Julien Cogné. The solutions look to be OK but the rear opening in the lounge cannot be changed. We will ....

Continue reading
Timber Frame

Staircase 4

5 February 202411 February 2024 gjj

In order to work on the upper mezzanine floor and bannisters, I decided to fit the smaller staircase between the two mezzanines. I have dismantled it downstairs and taken all the steps home for Jude ....

Continue reading
Staircase

Internal Electrics

2 February 202411 February 2024 gjj

It does not looks much but it took most of the day to fit the 16mm cabling in the distribution board then make the final connection at the temporary supply. 16mm is difficult to work ....

Continue reading
Electrics, External, Ground Floor

Timber Frame Cladding Arrives

1 February 202411 February 2024 gjj

Sitting happily at home catching up with paperwork I got an urgent call from my neighbor Andrew. Apparently a lorry had arrived from Estonia with no notice containing our timber cladding of charred and oiled ....

Continue reading
External, Timber Frame

Attic Floor and Garden Store

31 January 202411 February 2024 gjj

Arrived late today and used the morning that remained to move some storage shelves and garden items from the rented storage to the new garden store. Lots of space in both stores now so more ....

Continue reading
Attic, Garden Store

Tidying Up

30 January 202411 February 2024 gjj

Excellent weather for opening the doors and tidying up the interior before offloading the latest timber delivery. Florent has once again organised the purchase and lent me his lorry to bring it to site. Esteban ....

Continue reading
Car Park, External, Ground Floor, Staircase

Earthing

29 January 202411 February 2024 gjj

French electrical installations rely on local earthing points. With three main panels (house, PV panels on BBQ and PV panels on car park where the mains supply enters the property) I decided to fit three ....

Continue reading
BBQ/Workshop

Staircase 3

26 January 202411 February 2024 gjj

As the staircases are prefabricated, the risers are not set to match the difference between the finished floor levels (FFL). So to set the best first and last rises I have put the smaller staircase ....

Continue reading
Staircase

Staircase 2

23 January 202411 February 2024 gjj

We opted for an industrial staircase from Tecrostar in Spain. Our neighbours in Preroux have built a mezzanine and staircase from the same company and we thought it would fit well with the windows and ....

Continue reading
Staircase

Posts pagination

Previous page Page 1 … Page 24 Page 25 Page 26 … Page 42 Next page

Recent Posts

  • May 3
  • April 30
  • April 29
  • April 28
  • April 24

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.