Upper Mezzanine Floor 6
Time to move inside and make a start on the floor for the office on the upper mezzanine. First I had to finish securing the oak strengthening beams using the M12 threaded bar.
Outside I fitted guttering to both small storage units. No down. Pipes yet, just a small hole drilled through to let the water out.
Also made a start trimming back the apple tree that is entangled with the conifer.