Workshop 1
Finished off the timber framing of the workshop including the second window opening.
Both verticals and horizontals for the eventual cladding.
extending the sides of the roof for the PV panels.
In between other work I am slowly clearing out the house (for the underfloor heating and screed) and the garden (for the sewage system when it stops raining).
Here I have set up (temporarily) the stone seats rescued from the old house behind the fencing on the land we own next to the rear stream/ditch as they were blocking part of the garden.