Underfloor Heating 3
While my two assistants watched on, I rearranged the main staircase components, moving them from the first floor to the upper mezzanine. I also sorted the various lengths of parquet ready for the next few lines of wood to go down.
I concentrated on laying the next loop of heating pipes for the utility room and corridor. Tohelpo hold everything in place and get the right lengths, I have started to install the pipes to the manifold which is supported in place from the joists above.
Luc is clearly trying to point out where I have done something wrong.