With the old warped beams removed from the upper mezzanine, a support beam to level the new oak beams is placed in position.
With the first floor and lower mezzanine joists in place I have installed some temporary flooring to enable me to set up a work table and access the joist hangars for the attic floor joists that now need to be installed.
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1580-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1576-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1577-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1579-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1578-1024x576.jpeg)
![](https://15rsb.xsxtc.uk/wp-content/uploads/2023/11/IMG_1575-576x1024.jpeg)
Aerial view of the rear path with its diverse to allow for the base for the heat pump.