15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
August 31  |  
August 24  |  
August 22  |  
August 21  |  
August 20  |  

Author: gjj

Windows 2

12 July 202311 February 2024 gjj

Good progress on the windows that are now nearly all concreted. One more to go. A new external office by the caravan.

Continue reading
Car Park, Windows

First Floor Joists 6

10 July 202311 February 2024 gjj

I have laid the floor in the right direction this time as it is just enough for the scaffolding to fit onto. View from the bedroom window.

Continue reading
First Floor, Windows

First Floor Joists 5

8 July 202311 February 2024 gjj

First section of the floor installed. Florent will also need this side of the building to ache a floor for accessing the original windows that need their lintels raising to get the electric volets in ....

Continue reading
First Floor

First Floor Joists 4

7 July 202311 February 2024 gjj

Trial holes for installing the sewage (assainissement) system were dug and surprise, surprise they are full of water. Consequently the system cannot be a standard one but instead an electrically driven micro station. Cost will ....

Continue reading
External, First Floor, Ground Floor, Windows

First Floor Joists 3

6 July 202311 February 2024 gjj

With the floor in, the windows can be started at the back of the house. To get the scaffolding up outside the eventually pathway needed to be part laid. By the end of the day ....

Continue reading
External, Kitchen, Lounge

First Floor Joists 2

5 July 202311 February 2024 gjj

I am working hard to keep ahead of Florent and his team. they need a floor in to be able to set scaffolding and work on opening the upstairs windows. so once I had enough ....

Continue reading
First Floor

First Floor Joists 1

4 July 202311 February 2024 gjj

The first floor sits between new joists and above the existing beam. First the wall joists (double) were installed and bolted with a special resin. Than the hangers added. Despite all my planning, the bolts ....

Continue reading
First Floor

External Concreting

4 July 202311 February 2024 gjj

I turned up late in the morning to find the new beam had been installed and levelled and most of the external concreting had been done. The rear patio. The workshop and BBQ area that ....

Continue reading
BBQ/Workshop, Bike Store, External, Kitchen, Utility

External Concreting Preparation

30 June 202311 February 2024 gjj

The wall rendering is finished. The concrete support is re-shuttered to be raised to the new height. The hole to receive the far end of the new beam has been raised and moved to get ....

Continue reading
BBQ/Workshop, Bike Store, External, Garden, Garden Store, Lounge, Upper Mezzanine

Internal Walls Rendered

23 June 202311 February 2024 gjj

With the concrete removed from the walls the team got on with applying a cost of lime based mortar. Not quite finished but it make a huge impact on the inside to have the walls ....

Continue reading
Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 31
  • August 24
  • August 22
  • August 21
  • August 20

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.