Ground Floor Tiling 4

20 May 202423 June 2024 gjj

It is Monday morning and although I came over on Saturday to see what was happening I forgot to take a photo. They did turn up and brought enough materials to finish as can be ....

Continue reading
Electrics, Ground Floor, Utility

Ground Floor Tiling 3

17 May 202423 June 2024 gjj

Second day of screed mixing. Good progress but the materials are running out. Even with the extra bags of sand you can see in the driveway that were delivered this morning it will not be ....

Continue reading
BBQ/Workshop, Ground Floor

Ground Floor Tiling 2

16 May 202423 June 2024 gjj

Today the screeders arrived to lay the ground floor over the underfloor heating pipes. While they organised themselves, I finished off the installation of the earthing points in both the workshop and the car park ....

Continue reading
BBQ/Workshop, Car Park, Ground Floor

First Floor Flooring 9, EV Charger installed

15 May 202423 June 2024 gjj

A record of the position of the central point of the fibre optic cable where the rods were brought together. Now all buried and without the inspection chamber that is now redundant. On the first ....

Continue reading
Car Park, First Floor, Garden, Services

Fibre Optic Arrives. First Floor Flooring 8

14 May 202424 June 2024 gjj

The free.com engineer is due this afternoon so I spent this morning with some small issues. First, I have installed a threshold for the workshop door as there will be different tiling inside the workshop ....

Continue reading
First Floor, Garden, Services

Fountain 1, Ground Floor Tiling 1, First Floor Flooring 7

13 May 202423 June 2024 gjj

I have removed the plastic shuttering for the fountain foundation and have started playing with how it will look. I was just about able to move the base unit in which the pump is housed. ....

Continue reading
Garden, Ground Floor

Fibre Optic Preparation

10 May 202423 June 2024 gjj

No photos today. Just me and Phillipe our neighbour on site pulling through fibre rods in preparation for the visit next week of free.com to install the fibre optique cables. It has been a long ....

Continue reading
Services

More Minor Changes and First Floor Flooring 6

7 May 202423 June 2024 gjj

The finished repair of the front arch. Some changes to the kerbstones. The heat pump position had to be changed (the base was extended some time ago for it) so the pathway became too narrow ....

Continue reading
Entrance Gates and Arch, External, First Floor, Garden, Garden Store, Services, Waste System

Workshop Window and First Floor Flooring 5

6 May 202423 June 2024 gjj

Today Florent and his team are back on site for a couple of days to sort out some minor snagging issues. So I have got them to help me fit the large fixed window in ....

Continue reading
BBQ/Workshop, Bike Store, Entrance Gates and Arch, First Floor, Windows

Workshop Window

3 May 202422 June 2024 gjj

Using my glass suction handles and a bit of ingenuity, I have been able to get the glass out of the frame and stood on some blankets. I have then fitted the frame in place ....

Continue reading
BBQ/Workshop, Windows

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 31
  • August 24
  • August 22
  • August 21
  • August 20

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.