PV Panels 6

25 March 202416 June 2024 gjj

Each panel has its own inverter (so if a panel or an inverter fail, the rest of the system still keeps working). These are all connected via cables and plugs. It is a 3 phase ....

Continue reading
Car Park, Photovoltaic Panels

PV Panels 5

22 March 202416 June 2024 gjj

Car park panel supports fitted. Took time to saw some of the old beams from the upper mezzanine for future firewood. All stored behind the fence to keep the garden clear.

Continue reading
Car Park, Garden, Photovoltaic Panels

Workshop 2

22 March 202416 June 2024 gjj

With the frame in place, I have covered it with a breathable membrane. I t gives a good impression of the final space. On the car park roof the positioning of the supports for the ....

Continue reading
BBQ/Workshop, Car Park, Photovoltaic Panels

PV Panels 4

20 March 202416 June 2024 gjj

With both sides doe I can finally fit the rear trim to the roof. It has to be trimmed as the rear and side trims clash at the corners. So, on to the Car Park ....

Continue reading
BBQ/Workshop, Car Park, Photovoltaic Panels

PV Panels 3

19 March 202416 June 2024 gjj

Both sides of the roof are now extended and recovered. Rear of the house from the fence line.

Continue reading
BBQ/Workshop, External, Garden, Photovoltaic Panels

Workshop 1

18 March 202422 June 2024 gjj

Finished off the timber framing of the workshop including the second window opening. Both verticals and horizontals for the eventual cladding. extending the sides of the roof for the PV panels. In between other work ....

Continue reading
BBQ/Workshop, External, Garden

PV Panels 2

17 March 202416 June 2024 gjj

Now that the doors and windows are in, birds that get in via the roof cannot get out through the openings. I keep finding them near the doors where they have literally knocked themselves senseless. ....

Continue reading
BBQ/Workshop, Photovoltaic Panels

PV Panels 1

15 March 202416 June 2024 gjj

A break in the weather so I have started to install the support system for the panels and inverters on the car park and BBQ/Workshop roofs.

Continue reading
BBQ/Workshop, Car Park, Photovoltaic Panels

Upper Mezzanine Floor 6

14 March 202422 June 2024 gjj

Time to move inside and make a start on the floor for the office on the upper mezzanine. First I had to finish securing the oak strengthening beams using the M12 threaded bar. Outside I ....

Continue reading
Bike Store, Garden, Garden Store, Upper Mezzanine

Barbecue Guttering 2

13 March 202414 March 2024 gjj

Today I decided to finish off the guttering to divert the water away from the wall and front of the BBQ. I still need to install a set of down pipes but they are less ....

Continue reading
BBQ/Workshop

Posts navigation

Older posts
Newer posts

Recent Posts

  • July 2
  • July 1
  • June 30
  • June 28
  • June 27

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.