First Floor Flooring 9, EV Charger installed
A record of the position of the central point of the fibre optic cable where the rods were brought together. Now all buried and without the inspection chamber that is now redundant.
On the first floor I have started laying the plywood for the en-suite for the master bedroom.
Finally the correct plug has arrived for the 3 Phase connection for the car charger. Wouldn’t you know it, as soon as it went live, the lovely green lights changed to orange and red to indicate a fault on the system. Back to the drawing board with the Tesla service team ( it is a Tesla charger). The video shows it rebooting. It would start and finish with a single green light but it doesn’t.