Car Park 5

29 September 202311 February 2024 gjj

Before I could continue with the pergola I needed to sort the components into various piles so I could access them easily as needed The first job was to see if my lifting method would ....

Continue reading
BBQ/Workshop, Car Park

Entrance Arch Damage

28 September 202311 February 2024 gjj

As I left the site this evening I noticed that the crack in the arch has grown even wider. It was quite small when we bought the property but then enlarged following the earthquake. It ....

Continue reading
Entrance Gates and Arch

Wood Delivery

28 September 202311 February 2024 gjj

The wood arrived really quickly to Florent's stores. The oak beams are expected in a few weeks but the rest has arrived. I borrowed one of his vans and made two trips to to move ....

Continue reading
External

Car Park 4

26 September 202311 February 2024 gjj

Took me most of the day drilling the bottom of the 6 wooden posts and fitting the other half of the feet so that the posts could be installed to the bases. I laid the ....

Continue reading
Car Park

Car Park 3 and Attic Noggins

24 September 202311 February 2024 gjj

To start the day I finished off the few remaining noggins for the mid section of the attic floor before turning my attention to the car park pergola. The concrete pads were not in quite ....

Continue reading
Attic, Car Park

Drilling at Home

23 September 202311 February 2024 gjj

The inverters for the photovoltaic panels need to be fixed to the rails on which the panels sit to protect them from the weather. The fittings they sent originally were not correct and they have ....

Continue reading
External

Attic 2

20 September 202311 February 2024 gjj

Florent's team of workers have left for the moment as we are waiting on information for the sewage treatment plant before continuing so I am on site alone. I have finished the last part of ....

Continue reading
Attic

Car Park 1 and Attic 1

18 September 202311 February 2024 gjj

What a miserable day! Almost non-stop rain during the morning which flooded the site making it difficult to do the concreting of the bases for the pergola posts for the car park. In the brief ....

Continue reading
Attic, Car Park

Fibre Optic Cable

17 September 202311 February 2024 gjj

The only gaine (conduit) I installed without pre-wiring was the fibre optic. Issues with Orange (who manage the infrastructure in France) left me with no cable to insert. I have since bought my own to ....

Continue reading
External

Windows 5 (Cills)

16 September 202311 February 2024 gjj

With the jointing finished and the embedded bush root finally dead, we were able to cut out the exposed section, drill it and fill it with more herbicide just in case and finish off the ....

Continue reading
Bike Store, External, Windows

Posts navigation

Older posts

Recent Posts

  • May 3
  • April 30
  • April 29
  • April 28
  • April 24

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.