August 2

The first washing machine (which will eventually end up in the coldstore) is temporarily installed. 30 years old but the Miele is still working well.

Time has come for me to mark out and cut the holes for the lights in the ceilings. The master bedroom en-suite went well but despite mapping the lights in the bedroom, my third hole hit a joist which meant there was no room to fit the light. I had to reset the line 10 cms over to avoid the joist and then the wall fitted fine. One unwanted hole to repair.