Car Park 3 and Attic Noggins

To start the day I finished off the few remaining noggins for the mid section of the attic floor before turning my attention to the car park pergola.

The concrete pads were not in quite the correct position as they were rushed at the end because of the rainy conditions. It does not matter as the pads will not be visible once the gravel is applied and I have been able to set out the post bases on them, just not as centrally as I had hoped.

By the end of the day, all 6 bases had been marked out, drilled, plugged and the feet for the posts bolted down.