July 23

Lee has now applied a second coat to most of the surfaces. One final one to go then it is sanding prior to painting. The proper bandstand has arrived which is far more secure.

With Lee upstairs I have concentrated on finishing off the walls in the shower room. As the lower part of the plasterboard was ruined in a flood I have replaced it with nano board and jointed it to the plasterboard. The whole of these surfaces will be tiled so I have also applied a layer of PVA reinforced paint.