BBQ/Workshop 2
The first support is prepared with its foot and then stood in place on its bolted base resembling a Canadian Totem Pole. Ivo finds a comfortable spot to hide (under the caravan) while Luc decides ....
Views of the property from the outside
The first support is prepared with its foot and then stood in place on its bolted base resembling a Canadian Totem Pole. Ivo finds a comfortable spot to hide (under the caravan) while Luc decides ....
The first footing for the post of the pergola is quickly followed by the remaining five. Meanwhile, Esteban has been preparing the holes for the attic beams to support the joists for the attic floor.
The Douglas Fir pergolas have arrived together with the roofing materials. The three wheeled forklift was an amazing machine that could turn its wheels through 90 degrees to access difficult positions. Each pergola has been ....
If you have never seen it, this is sand blasting in progress. Jonathan has cleaned the wall (that will be exposed in the Lounge) and is here cleaning up the joists that will remain visible ....
I need to lift a lot of materials to the upper floors so I have bought and installed an electric hoist identical to the one I had at Le Chai. Making a start on the ....
The floor beam on the new concrete pedestal has been bolted with resin. The exiting windows are having their lintels raised and the view of the back of the house starts to take shape. Another ....
Good progress on the windows that are now nearly all concreted. One more to go. A new external office by the caravan.
Trial holes for installing the sewage (assainissement) system were dug and surprise, surprise they are full of water. Consequently the system cannot be a standard one but instead an electrically driven micro station. Cost will ....
With the floor in, the windows can be started at the back of the house. To get the scaffolding up outside the eventually pathway needed to be part laid. By the end of the day ....
I turned up late in the morning to find the new beam had been installed and levelled and most of the external concreting had been done. The rear patio. The workshop and BBQ area that ....