Category: External

Views of the property from the outside

BBQ/Workshop 2

1 August 202311 February 2024 gjj

The first support is prepared with its foot and then stood in place on its bolted base resembling a Canadian Totem Pole. Ivo finds a comfortable spot to hide (under the caravan) while Luc decides ....

Continue reading
BBQ/Workshop

BBQ/Workshop 1

31 July 202311 February 2024 gjj

The first footing for the post of the pergola is quickly followed by the remaining five. Meanwhile, Esteban has been preparing the holes for the attic beams to support the joists for the attic floor.

Continue reading
Attic, BBQ/Workshop

The Pergolas Arrive

27 July 202311 February 2024 gjj

The Douglas Fir pergolas have arrived together with the roofing materials. The three wheeled forklift was an amazing machine that could turn its wheels through 90 degrees to access difficult positions. Each pergola has been ....

Continue reading
BBQ/Workshop, External, Upper Mezzanine

Sand Blasting

25 July 202311 February 2024 gjj

If you have never seen it, this is sand blasting in progress. Jonathan has cleaned the wall (that will be exposed in the Lounge) and is here cleaning up the joists that will remain visible ....

Continue reading
External, First Floor, Lounge, Lower Mezzanine, Upper Mezzanine

Hoists not Joists

22 July 202311 February 2024 gjj

I need to lift a lot of materials to the upper floors so I have bought and installed an electric hoist identical to the one I had at Le Chai. Making a start on the ....

Continue reading
First Floor, Garden Store

Windows 4 and Oak Floor

19 July 202311 February 2024 gjj

The floor beam on the new concrete pedestal has been bolted with resin. The exiting windows are having their lintels raised and the view of the back of the house starts to take shape. Another ....

Continue reading
External, Windows

Windows 2

12 July 202311 February 2024 gjj

Good progress on the windows that are now nearly all concreted. One more to go. A new external office by the caravan.

Continue reading
Car Park, Windows

First Floor Joists 4

7 July 202311 February 2024 gjj

Trial holes for installing the sewage (assainissement) system were dug and surprise, surprise they are full of water. Consequently the system cannot be a standard one but instead an electrically driven micro station. Cost will ....

Continue reading
External, First Floor, Ground Floor, Windows

First Floor Joists 3

6 July 202311 February 2024 gjj

With the floor in, the windows can be started at the back of the house. To get the scaffolding up outside the eventually pathway needed to be part laid. By the end of the day ....

Continue reading
External, Kitchen, Lounge

External Concreting

4 July 202311 February 2024 gjj

I turned up late in the morning to find the new beam had been installed and levelled and most of the external concreting had been done. The rear patio. The workshop and BBQ area that ....

Continue reading
BBQ/Workshop, Bike Store, External, Kitchen, Utility

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 2
  • July 31
  • July 25
  • July 24
  • July 23

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.