
June 12
I have redesigned to the fan and ventilation unit to get some shelving into the wall cupboard and it works quite well. The base unit has gone in but the outlet pipe still needs to be sorted.



Stephane’s visit defined the heights and positions of the towel rails so I have been able to board that part of the wall. So the en-suite (excluding the ceiling) is now done.

The Guest bedroom is next. Insulation in.
