
May 28
The Master Bedroom is still to be finished but with the delivery of the hydro boards I have turned my attention to the two en-suites. After completing the wiring and the insulation, the boards can go on.
I cannot do the external walls as I have run out of vapour barrier and the merchant has run out of the insulation I use! I have got on with the internal walls.





