Skip to content
  • 15:20
  • Friday
  • 9 May 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
May 3  |  
April 30  |  
April 29  |  
April 28  |  
April 24  |  
External

May 3

Full story
Dining Room

April 30

Full story
Ground Floor

April 29

Full story

Windows and Timber Frame Installation 3, The Yale Lock

13 December 202311 February 2024 gjj

While Esteban and I continued Buiding and in part insulation the wall and enclosures for the electric shutters, Xavier and Kevin progressed the door installations. Here you can see the fixed window in the kitchen, ....

Continue reading
Windows

Windows and Timber Frame Installation 2

12 December 202311 February 2024 gjj

Second day of the installation and Esteban and I pushed on with the door openings. Xavier and Kevin got on with the installation of the utility room door followed by the fixed window and door ....

Continue reading
Windows

Windows and Timber Frame Installation 1

11 December 202311 February 2024 gjj

Today is Monday. Following a couple of short discussions on the revision to the windows quote last week, I received a revised price and arrangement via email and then a phone call on Thursday (7th) ....

Continue reading
Windows

Windows! and Electrical Distribution Panel 1

6 December 202311 February 2024 gjj

A combination of lots of issues including weather, lack of approval and my back has kept me at home planning for some time but today I am on site again for the first time since ....

Continue reading
Utility

Back to Work?

21 November 202311 February 2024 gjj

After our trip to the UK I am finally back on site to see that in my absence Florent has been back to install the internet fibre box connection through the wall and in a ....

Continue reading
External

Water, Water Everywhere

5 November 202311 February 2024 gjj

A little worrying as we are off to the UK next week and the site is now flooding. The ditch at the back of the property has overflowed into the garden preventing any further work. ....

Continue reading
External, Garden

Site Closure

3 November 202311 February 2024 gjj

With the water continuing to fall, Florent has only been able to tidy up the paths and fencing areas and has now left site until the sewage approval is received. timing is OK as we ....

Continue reading
External, Garden

Electrics and Fencing

2 November 202311 February 2024 gjj

The weather is turning very wet so I am pleased the fencing is now secured and looking good. I am waiting on approval for the sewage (assainissement) system before it can be installed so work ....

Continue reading
External, Garden

Floor Arranging

1 November 202311 February 2024 gjj

to maintain the flooring for the window installation I had to lift the temporary floor I had fitted (22mm) that is the attic floor and replace it with thinner (12mm) boarding that is destined for ....

Continue reading
Attic, First Floor

More Fencing and Floorboards

31 October 202311 February 2024 gjj

Dancing posts and gate cemented in. Lead flashing on storage roofs and the final joists are fitted.

Continue reading
Attic, Bike Store, External, First Floor, Garden

Posts pagination

Previous page Page 1 … Page 26 Page 27 Page 28 … Page 42 Next page

Recent Posts

  • May 3
  • April 30
  • April 29
  • April 28
  • April 24

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.