Windows and Timber Frame Installation 15
With the plywood installed, I started applying the breathable membrane
and once it was completed
finished off by fixing the battens to support the timber cladding. I even managed to put up one piece of cladding.
However, before installing more cladding I need to install the piece above the door opening onto which the verticals will placed. Single haded it took some time so decided that was enough for the day.