August 11
Time to concentrate on getting a shower and toilet installed before the move.
Time to concentrate on getting a shower and toilet installed before the move.
Guest ensuite lights and ventilation in. The most important part of the move into the house. The utility room cupboards and work surfaces start to go in.
Wardrobes fitted. Guest en-suite lights and ventilation going in and ceiling hole from moving lights repaired. Furniture begins to pile up in the lounge as we start to empty the rental property in preparation for ....
Installing the wardrobes in the walk in dressing room including moving the sockets from the wall to the rear panel of the wardrobes.
The first washing machine (which will eventually end up in the coldstore) is temporarily installed. 30 years old but the Miele is still working well. Time has come for me to mark out and cut ....
Lee finished and left site Tuesday. Dominic and I spent Monday moving the plasterboard outside under protective plastic to make room for the incoming furniture. Tuesday and Wednesday were spent moving the furniture from the ....
A trip to collect some wood for a solid solution and then fit it and cover it with nano board ready for tiling. Lee has prioritised the painting of the dressing room so that I ....
The PVA paint applied and dried.I then set out the tiling lines to avoid silly cuts and set a horizontal starting point. Eventually the bottom tiles will be cut to match the slope of the ....
Lee has now applied a second coat to most of the surfaces. One final one to go then it is sanding prior to painting. The proper bandstand has arrived which is far more secure. With ....