June 16
En-suite for the guest bedroom is finished including filling in the gaps between the boards before Lee and Jacq arrive to do the jointing and decorating. Good progress also made in the guest bedroom itself. ....
En-suite for the guest bedroom is finished including filling in the gaps between the boards before Lee and Jacq arrive to do the jointing and decorating. Good progress also made in the guest bedroom itself. ....
Still waiting on the vapour barrier so only the internal walls can be sorted at the moment. The on going problem with the shutter over the front door, whose motor is effectively in the guest ....
I have redesigned to the fan and ventilation unit to get some shelving into the wall cupboard and it works quite well. The base unit has gone in but the outlet pipe still needs to ....
A visit to Bordeaux to pick up the missing items and would you believe it, they gave me the wrong size door for the lower unit. Happily they will come to change it over at ....
Three years on I am still trying to recover fire damaged goods. This is the router that is attached to the router table. Despite heroic efforts the screws holding the router to the table have ....
Saturday shift. Utility room units start to be positioned. I am impressed with the advances IKERA have made in their support systems but less so with their instructions! The top middle unit needs to be ....
With no insulation or vapour barrier I am trying to use my time effectively so the IKEA cabinets have started to be assembled for the utility room. Upstairs I have completed the master bedroom internal ....
Closing out some fiddly jobs while waiting for an IKEA delivery. Internal walls of the cupboard space on the mezzanine walkway prepared and used as storage for the first floor ceiling insulation. IKEA delivery arrived ....
Getting ready to bing the kitchen in. The AGA is stored with Henri next door but I recovered the base demonstrate its final position. The cooker hood is also waiting to go up.