Category: Ground Floor

January 8
I am designing the shower room basin area on the fly to hide the services and form some useful shelving. Proving trickier than I thought. The front is now structured but I have to work ....

January 7
Not much to show for a day’s work but these will be the ventilation pipes for the shower and utility rooms. A bit tricky getting the long pipe in through the bogging and with the ....

January 6
With the cold store done (except for the ceiling) I turn my attention to the shower room. The sewage pipes are dismantled and glued back In place before getting hidden. Also found time to finally ....

January 3
More plasterboarding in the cold store. The interior walls get insulated to separate the cold store from the rest of the house. Over the insulation the plasterboards are fitted. The final piece is over the ....