
July 15
Everything is now ready for Lee to come in and joint the boards with the exception of this corner in the guest bedroom.
The issues with the volet over the front door has still not been resolved as parts are not yet in at Soccer so this section has to be left open for them to access the mechanism when they come to fix it.
On a brighter note, I have sourced some larger wine bottle racks (150 bottles each instead of the current 100) and the first one has been fixed in place in the cold store. The first batch of wines have been moved into place. More to come.

