15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
June 28  |  
June 27  |  
June 25  |  
June 24  |  
June 19  |  

Category: Entrance Gates and Arch

PV Panels And Another Cable

2 June 202311 February 2024 gjj

After pouring the concrete for the lintel above the door, the team got back to floor preparation laying the reinforcing bar for the concrete pour. We wanted to organise it for this week but the ....

Continue reading
Car Park, Entrance Gates and Arch, External, Kitchen, Lounge, Utility

Electrics and External Progress

26 May 202311 February 2024 gjj

The temporary barrier between our garden and Henri's has been taken down in preparation for laying the foundations of the wall that has to be built there. So for a while the dogs cannot be ....

Continue reading
BBQ/Workshop, Car Park, Entrance Gates and Arch, External, Garden, Kitchen, Lounge, Utility

BBQ and Services

22 May 202311 February 2024 gjj

When I arrived this morning after leaving early on Friday I was pleased to find the BBQ and Workshop area had been prepared and compacted along with the cleanse and preparation of the bike store. ....

Continue reading
BBQ/Workshop, Bike Store, Entrance Gates and Arch, External, Garden, Kitchen, Lounge, Utility

Pathway Progress

19 May 202311 February 2024 gjj

By Friday morning they were moving down the site preparing and compacting the pathway that will join the gates to the house but will also serve as the temporary roadway for Florent to get materials ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden

The Contractors Begin

17 May 202311 February 2024 gjj

Florent Maitre and his team arrived Monday 15th to start on site and I was there first thing to hand it over to him. The rest of the day and Tuesday I was otherwise occupied ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden

Floor Removal and Tidying Up

14 May 202311 February 2024 gjj

Tea time over I took these high level shots to show the trenches all filled. Philippe and I then turned our attention to removing the rest of the first floor (or at least the bits ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden, Guest Bedroom, Kitchen, Lounge, Lower Mezzanine, Master Bedroom, Upper Mezzanine, Utility

Electrics and Telecommunications

7 May 202311 February 2024 gjj

So with the water in I am now lying the electrical and last of all, the telecoms gain. the bottom picture shows the me laying out the gaine (green) around the garden (including around trees ....

Continue reading
Car Park, Entrance Gates and Arch, External, Garden

Crossing the Site Boundary

6 May 202311 February 2024 gjj

Florent dug the trench up to the doorway but left me to do the bit up to the water main box. I followed his guidance from the evening before and it was surprisingly easy to ....

Continue reading
Entrance Gates and Arch, External, Garden

More Trenches

5 May 202311 February 2024 gjj

Temporary water supply pipework installed although there is not yet a connection to the the main box that I will have to sort out. Trenches are full of roots around the trees that need to ....

Continue reading
Entrance Gates and Arch, External, Garden

Cycling to Work

30 April 202311 February 2024 gjj

As part of the programme to get ready for this year's Cyclopes meeting being held in the UK thanks to Dave and Josie, I decided to cycle from the house to the site. 28 kms. ....

Continue reading
Bike Store, Entrance Gates and Arch, External, Garden

Posts navigation

Older posts
Newer posts

Recent Posts

  • June 28
  • June 27
  • June 25
  • June 24
  • June 19

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.