Category: Car Park

Car Park 3 and Attic Noggins

24 September 202311 February 2024 gjj

To start the day I finished off the few remaining noggins for the mid section of the attic floor before turning my attention to the car park pergola. The concrete pads were not in quite ....

Continue reading
Attic, Car Park

Car Park 1 and Attic 1

18 September 202311 February 2024 gjj

What a miserable day! Almost non-stop rain during the morning which flooded the site making it difficult to do the concreting of the bases for the pergola posts for the car park. In the brief ....

Continue reading
Attic, Car Park

PV Panels 2

8 September 202311 February 2024 gjj

As part of clearing the car parking I have had to move all the PV panels, not just those for the BBQ area. Discovered a second one damaged unfortunately so that will also need replacing. ....

Continue reading
BBQ/Workshop, Car Park

Windows 2

12 July 202311 February 2024 gjj

Good progress on the windows that are now nearly all concreted. One more to go. A new external office by the caravan.

Continue reading
Car Park, Windows

More Ivy Removal

10 June 202311 February 2024 gjj

Quiet day on my own on site today. Finally finished off the ivy on the walls behind the car parking area and down the wall on the roadside between the parking area and the arch. ....

Continue reading
Car Park, Entrance Gates and Arch, External

Garden Wall 2, More Walls and Ivy

7 June 202311 February 2024 gjj

When I left last night the wall had progressed well and this morning it looks good having dried out. They are doing a good job matching the existing stonework and I am sure that Henri ....

Continue reading
Car Park, External, Garden

PV Panels And Another Cable

2 June 202311 February 2024 gjj

After pouring the concrete for the lintel above the door, the team got back to floor preparation laying the reinforcing bar for the concrete pour. We wanted to organise it for this week but the ....

Continue reading
Car Park, Entrance Gates and Arch, External, Kitchen, Lounge, Utility

Electrical Connection and Caravans

27 May 202311 February 2024 gjj

Finally sorted the electrics with the multi-meter. The temporary cable has been run to the future meter box position on the garden wall. There I have connected the three phase supply to one of of ....

Continue reading
Car Park, External

Electrics and External Progress

26 May 202311 February 2024 gjj

The temporary barrier between our garden and Henri's has been taken down in preparation for laying the foundations of the wall that has to be built there. So for a while the dogs cannot be ....

Continue reading
BBQ/Workshop, Car Park, Entrance Gates and Arch, External, Garden, Kitchen, Lounge, Utility

Tie bar and Internal Services

25 May 202311 February 2024 gjj

The tie bar arrived late last night and when I arrived this morning it had already been positioned. I helped with the tensioning but essentially it is done and the remaining wall can be taken ....

Continue reading
Car Park, External, Kitchen, Utility

Posts navigation

Older posts
Newer posts

Recent Posts

  • July 2
  • July 1
  • June 30
  • June 28
  • June 27

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.